Infrastructural Projects
The country’s progress and economic growth is dependent on the availability of basic quality infrastructure, such as roads, national highways, power grids, irrigation schemes, etc. We are tirelessly working to elevate dynamic urban infrastructures so that we can help utilize the true potential of our country's resources and put India on the road to success.
• Construction of Phase I of the 16MW Hydro power project in joint venture with Aryan Constructions, Pune. The project included a 5 KM approach road, a 500m-length tunnel, spillway, an earthen dam of 55m-height and an underground power station.

• The government-funded project was executed with a focus on utilizing the available resources more efficiently by minimizing T&D losses and maximizing energy savings.

• Formulation of a concept design and budget was followed by development of strategies to make sure that the project is executed within the targeted schedule and budget.

• Apart from Standard Engineering Details (SED), our team also formulated extensive technical specifications for works and materials to ensure sound engineering.


• Construction of the unique project involving the turnkey solutions for strengthening the western grid with new 400/220 KV substations set up in Panvel and Solapur.

• Scope of work included foundation of towers, construction of control room, fire fighting building, switchyards, security cabins, water tanks, DG foundations and associated works.

• To ensure maximum commitment to space saving and safety benefits various surveys & soil investigations were conducted during planning and execution of the project.

• Various modern techniques were deployed and great care was taken to properly install the system materials so that they will meet their design life expectations.


• Construction of the state of the art Co-generation Power Plant with a power yielding capacity of 9 MW at Shree Pandurang Co-operative Sugar Factory Ltd. in Sheerapur.

• Scope of work included construction of power-house, boiler house, switch yard, machinery foundation and cooling tower.

• The project comprises of impressively planned features with electro-mechanical works and was completed in a time frame of just 8 months.

• Innovative engineering solutions and latest project management techniques such as quality control services on materials and workmanship ensured uninterrupted supply of power and steam.